Skip to content

Merge a meeting's outcomes into a project

A meeting produces three things: work, a record of what was decided, and whatever was built in the room. Merging is the step that moves the first two into the project, so the conversation stops being a transcript and becomes the project’s state.

This page follows the Summitline kickoff into Summitline Launch.

  1. Open the meeting and review its drafts. Accept the ones that are real work, reject the rest.

  2. In the meeting’s panel, open Merge to Project. Before the merge it stages what you accepted: the counts, each draft with an Execute or Backlog toggle, and the merge action itself.

  3. Merge N Tasks to Project.

The kickoff meeting's merge panel after the merge, showing the drafts that became tasks in the Summitline Launch project.

What the meeting hadWhere it goes
Accepted task draftsTasks in the project, each with a short key in the project’s sequence
Decisions, requirements, scope, risks, open questionsProject Data, tagged with the meeting they came from
Dependencies between draftsKept, so a task that waits on another still does
Artifacts (diagrams, decks, captured pages)Stay on the meeting, and are reachable from it forever

Artifacts are the one thing that does not move. A deck belongs to the conversation that produced it, and the meeting stays linked from every task and from the project’s Meetings tab, so nothing is stranded.

The merge panel reports what it did; the project is where you confirm it. Open the project and check three places, in this order:

  1. Tasks. The new work, numbered in the project’s sequence. This is the merge from the other side.

    Summitline Launch's Tasks tab after the kickoff merged into it: the accepted drafts as real LNCH tasks.

    Each task carries its priority and whether it shipped ready or to the backlog, and each links back to the meeting it came from.

  2. Project Data. The decisions, requirements, and scope items the meeting recorded, each tagged with that meeting. A conversation that produced work without recording any explicit decisions leaves this tab where it was, which is not a failed merge: nothing was dismissed, there was simply nothing of that kind to promote.

  3. Overview. The counters are the same numbers as the two tabs above, and each is a link into the tab behind it.

A merge is applied once. Re-opening the panel afterwards reports what the meeting produced rather than offering to do it again: how many drafts became tasks, how many were rejected, and View Project Tasks to open the work where it now lives.

Dismissing an item during the merge drops it from that promotion. It is not deleted from the meeting, so the conversation still records it.